Turaif Airport

City: Turaif

Sector: Airports & Aviation

Status: Completed

Overview: This project reflects Borooq Al Arabia’s capability in delivering systems within sites that require high operational readiness, clear response frameworks, and maintenance planning to support continuity

Challenge: The project required a high level of operational readiness while maintaining clarity in handover procedures and documentation.

Solution / Execution Methodology:
The works were executed through a structured sequence starting with defining scope and operational requirements, followed by phased implementation, inspection, testing, and the preparation of documentation deliverables that support clear and efficient handover.

Handover Deliverables / Execution Outcome:

  • Works executed in accordance with the approved scope
  • Support for testing and system operation
  • Clear and structured technical reports
  • Checklists and closure of observations
  • As-built drawings (as required)
  • Handover documentation and optional basic training upon request